The project, consolidated
What changed
Henry opened the otherwise awkward space under the entry-side closet so shoes could be put away immediately after stepping inside. The existing receptacle occupied that area, so the electrical work became part of the project.
The rounded rectangular cutout provides open storage without adding a door or drawer. The receptacle moved above the closet, and an accessible connection inside the closet also created another useful power point.

